It is surveying for Detailed Design of Constructing Dam to raise level in Chao Phrara and Nan Rivers for vessels navigation and proposing to fix the problem of barriers in vessel navigation in Chao Phrara River and Nan River Transportation of goods connection with multiple modes after landing to increase transportation efficiency which will lower cost of efficient water management and integrating to get maximum benefit together
Consultancy Services including:
•Economic Study Work
•Engineering Works
•Environmental Impact Assessment Study in details and impact assess on Health
•Public Relations for promoting the participation of citizens and seminars to inform the results and obtaining feedback
•Study in accordance with Project Management and Administration
•Development of Data Base for Transportation and Inland Water Seashore and between Foreign Country Passengers
•Engineering Support and Technological Knowhow Transfer to the personnel of Department
•Preparation of Work Specifications (Term of Reference, TOR) for the hiring of Construction Supervision Consultant
•Preparation of Tender Documents
Name of Project | Survey, Detailed Design and Environmental Impact Assessment Study for Construction of Damming the Chao Phraya River and Nan River for Improvement of Inland Water Transport |
Location | Central Region |
Client | Marine Department |
Duration | September 2014 – October 2015 |
Project Cost |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must