Detailed design of Hardstand and the structure of 103 turbine bases.
Consultancy Services including
•Design soil cut, soil fill and area preparation for construction in project area (Hardstand) 103 Wind turbine bases
•Preparation of a Hardstand calculation sheet with signature certify in document
•Preparation the Hardstand details and signing the certification forms
•Preparation Detailed Drawings Specifications Hardstand work by using local materials
•Preparation Cost Estimate Document of Hardstand and signing in document
•Preparation Hardstand document for permit submission with signature of Designer, Supervisor in the application submission period (Other than this scope, the project will prepare)
•Preparation Hardstand details document – Calculation Sheet, Specification, Cost Estimate in CD ROM format
•Answer for question with Owner Engineer (OE) and Lender Technical Advisor (LTA).
Name of Project | Consultancy Services for Details Design Services for Construction of Wind Turbine – Hanuman Wind Farm 260 MW Project |
Location | Chaiyaphum Province |
Client | Energy Solution Management Co., Ltd. (ESM) |
Duration | September 2016 – September 2018 |
Project Cost |