Unilever Thai Holdings Ltd. intends to expand Knor for Jok Building a 3-storey building with area of 5,120 square meters by construct besides the existing building.
Project detailed design management and construction supervision the works as following:
Phase 1 : Survey and Design Work
• Land Survey and Soil Survey for the expansion area.
• Engineering Design of Pilling & Foundation Work, Structure Work, Architectural Work, M&E System, Electrical System and Communication System, Fire Alarm System & Sprinkler, Utility System.
• Prepare Tender Document, Cost Estimate, BOQ and Specification including Contractor Selection.
• Prepare document for Permission Certificate Application to the Industrial Estate Authority of Thailand.
Phase 2 : Construction Supervision Work
Name of Project | Detailed Design and Construction Supervision of Knor Building Expansion for Jok Project |
Location | Gateway City Industry Estate, Bangkok |
Client | Unilever Thai Holding Ltd. |
Duration | April 2010 - December 2011 |
Project Cost |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must