Project consists of Turbine & Generator building 2-storey size 20 x 36 meter, Condensate polishing plant size 15 x 20 meter with foundation of Recovery Boiler, Condensate tank & Make-up water tank, Small process pump and Pipe rack including road, drainage system, car parking and walkway.
The services included the following works:
•Detailed design
•Cost Estimation
•Tender document preparation
•Construction Supervision
Name of Project | Consulting Services for Detailed Design and Construction Supervision of the New Recovery Boiler#1 Project |
Location | Khon Kaen |
Client | Phoenix Utilities Co.,Ltd./Phoenix Pulp & Paper Public Company Limited (PPPC) |
Duration | July 2009 - October 2010 |
Project Cost |