Detailed Design and Construction Supervision of Liquid Sauces Plant at Gateway City Industrial Estate

Narrative Description

           The construction of Liquid Sauces Plant located at the existing CPC/AJI Plant, Gateway City Industrial Estate, Chachoengsao Province. The scope of work for detailed design and construction supervision consisting of:
1.Main Building
Area-1: Processing Room, Filling Room and Packing, total floor area of 920 m2
Area-2: Spices Room, Chilled Room, total floor area of 155 m2
Area-3: Warehouse Office, 32 m2
Area-4: Warehouse, 384 m2
Area-5: Loading Area and Loading Shade, 290 m2
Area-6: Loading ground, 1,000 m2
2.Walkway
3.Workshop Building
4.Canteen/Lockers Extension
5.Car Park (Asphalt Pavement), Internal Access Road (Concrete Pavement) including Utilities Systems.

Services Description

Services for detailed design and construction supervision works are as following:
Detailed Design
•Detailed design of architectural, civil/structure, electrical, mechanical and sanitary systems
•Preparation of drawings and specification
•Preparation of Bill of quantities and budget cost estimates
•Preparation of project schedule
•Preparation of tender documents and condition of contract
•Economic justification of the project.
Construction
•Pre-construction phase : Tendering and Contract awarding
•Construction Phase : supervision of construction  

Name of Project Detailed Design and Construction Supervision of Liquid Sauces Plant at Gateway City Industrial Estate
Location Chachoengsao Province
Client CPC/AJI (Thailand) Ltd.
Duration October 2001 – December 2002
Project Cost