Kiew Kho Ma Dam is the multipurpose dam at Lampang province developed by Royal Thai Irrigation Department. The main purpose is for the irrigation area in the Mae Wang Basin (Kui Low I & II) 143,750 rai, new irrigation area in Chae Hom District 20,000 rai, and all Kui Lom III construction area 70,200 rai with total 90,400 rai, in dry season the new irrigation area 30,000 rai. The Construction Supervision of Head Work and Appurtenance Structures of Kiew Kho Ma Dam Project including:
•Main Dam type zone type dam with size 500 m. crest length, 43.50 m. Depth and storage capacity of 170 million cu.m.
•Spillway radial gate 3@ 12.5 x 7.0 m. Discharge capacity 1,209 cms.
•Reinforced Concrete Steel Liner diameter 2.5 m. Length 360 m. Discharge Capacity 12 cms.
•Foundation and relate facility.
The service provided by SEATEC include:
•Review and correction As-build drawing.
•Prepare Construction data before Construct.
•Supervision of all Construction Works.
•Submit report to RID.
•Conduct training for operations of operator, preparation of operating / service / Maintenance manuals.
Name of Project | Consultancy Services for Construction Supervision of Headworks and Appurtenance Structures of Kiew Kho Ma Dam Project |
Location | Lampang Province |
Client | Royal Irrigation Department (RID) |
Duration | August 2005 – December 2008 |
Project Cost |