General factory building, 1 floor, height 40-45 meters, factory building and auxiliary buildings total area 14,000 square meters. There are 6 silos to store raw materials, width 15 meters, height 60 meters. Project area 25 rai.
The services included the following works:
•Define work planning
•Check shop drawings
•heck material and equipment
•Organize weekly meeting between the contractor and owner representative to report progress, resolve problems and adjust the work plan
•Check and propose construction comment, consider changing and increasing, decreasing work, inform and advise to owner
•Prepare weekly reports
•Control construction work of construction contractors
•Control the work according to the construction drawings and construction details drawings
•Check testing, check materials and the complete work of contractor.
•Considering request for payment, wages of contractors and propose to the owner to pay wages
•Check payment for additional construction work
Name of Project | Consultancy Services for Construction Supervision of Soil Mate Project Nong Khae, Saraburi |
Location | Saraburi Province |
Client | Plus Productivity Ltd. |
Duration | August 2018 – June 2019 |
Project Cost |
© 2020 Seatec Group. All Rights Reserved.