Airports of Thailand Public Co., Ltd. intended to develop Phuket Airport in fiscal year 2010-2014. The construction consists as following:
1)Aviation Operation Area
•Taxi way, Aprons including Fence around the operation area
•Other related Infrastructure
•Renovation and expansion of aviation fuel pipeline
•The dismantled and moved the existing wastewater treatment plant
•Other relate construction
2)Terminal Building
•Construction of international passengers terminal and related utilities
•Renovation of the existing international passengers terminal building and related utilities
•4 sets of Passenger Loading Bridge including PC Air
400 Hz and Docking Guidance System
•Connection between the new international terminal building and original terminal building
•Special equipment systems and other relate construction
•The dismantled and moved the obstruction of original building for the construction work
3)Substitutional and Supporting Building
•Parking building and improvement of areas near by
•Airport Operations Building
•New Cargo Building and parking area at front
•Ground Support Equipment Services Building and OM Building including car parking with roof
•Fire/Rescue Stations Building with Parking area and
road connection to taxi way
•Office of Maintenance and Warehouse Phuket airport Building with facility and parking area
•Other relate construction
4)Infrastructure and Utility Systems
•Road system inside the airport and elevated roadway
•Landscape
•Substation
•Airport Information System Network
•Water supply systems and wastewater treatment systems
•Solid Waste Collection Building and System Works Building
•The dismantled and moved old Solid Waste Collection Building
•Other relate construction
The services included the following works:
•Provide the professional staff to perform the services.
•Control the relocation or demolition of old buildings if necessary to remove
•Review and approve the construction plan, supervision of operations in accordance with the construction plans and prepare the progress report from the meeting.
•Review and approve the Baseline Plan as need.
•Co-ordinate with other consultancies contract for improve project.
•Co-ordinate with designer and concerned authorities.
•Approve Material and Equipment as specified in construction drawing and specification.
•Review and approve As-Built Drawing.
•Review and approve Shop Drawing.
•Review the control of the construction cost and the estimated cost of the project.
•Support to AOT for various technical during construction work.
•Control of equipment and material test.
•Inspection and certify construction work for contractor work of each processes.
•Prepare quality assurance plan for the services to be used during the implementation of each of the stages of the services
•Negotiations for settlement of the problem Arguments and disputes between owners and contractors.
Name of Project | Consultancy Services for Construction Supervision of Phuket Airport Development Project (Fiscal Year 2010-2014) (Aviation Operation Area, Substitutional and Supporting Building, Infrastructure and Utility Systems |
Location | Phuket Province |
Client | Airports of Thailand Public Co., Ltd. |
Duration | October 2012 – July 2018 |
Project Cost |