Construction Supervision of Road, Drainage System and Slope Protection at Phramahajadee Santi Keeree Doi Mae Salong

รายละเอียดโครงการ

       SEATEC Group, Dynamic Engineering Consultants Co., Ltd. (DEC) carried out the construciton supervision for the drainage system of surface water and ground water along the roadside including protection for the land falling at the East of Srinakarintra-Stitmahasantikhiri Pagoda at Doi Mae Salong, Mae Pha Luang District, Chiang Rai Province, Slope protection is covered the approximated area 23,420 m2.
•Road 1234 from Sta. 3+100 to 3+833.230, total 733 m.
-Concrete road thick 23 cm, length 247 m.
-Asphaltic road thick 5 cm, length 486 m.
•Ground water and surface water drainage system along the road 
-Pipe culvert work length 55 m. 
-Side ditch length approx. 3,350 m. 
-Step drain length approx. 1,450 m.
-U-Ditch & Steel grating length 150 m.
•Side slope protection at the East of Pagoda for the area approximately 23,420 m2.
•Stair work

รายละเอียดการดำเนินงาน

Project construction supervision including :
•Supervision of all construction including engineering and architecture.
•Control and monitor the construction work plan.
•Reviewing and approving the as-built drawing and materials.
•Preparation and cash flow control as planned.
•Prepare monthly reports.
ชื่อโครงการ Construction Supervision of Road, Drainage System and Slope Protection at Phramahajadee Santi Keeree Doi Mae Salong
สถานที่ Chiang Rai Province
เจ้าของงาน Supreme Command Headquarters
ระยะเวลาดำเนินการ September 2001 – July 2003
งบประมาณ