People encounter with the increasing problems of water storages which is because the development of each water resources basin has no system for overall management. There for the Department of Water Resources has policy to integrate plans for water management in each river basin with same direction by objectives as flowing:
•The integrated plans for water management in each river basin in the same direction.
•Provide an overall of the river basin in terms of demand and supply solutions and clear management of water resources for the organization and local people to participate in the plan.
•Master plan for the management of water resources in systematic way, for the development of water resources, to prevent and mitigate disasters caused by water, the sustainable management of water resources, and conservation of water resources and monitoring water quality.
Project Integrated Plan of Water Resources Management the works as follow :
•Survey collected basic information on economic and natural water resource and construction.
•Analyze the potential of water resources in each catchment, with the classification has been developed. In accordance with the potential of other resources such as land, forests and environment.
•Collection, analysis results of the study, planning project conducted by various sources to prepare performance summaries the way to proceed.
•Inquiries and hearings about the problems, the need for guidelines for management of water resources with the sub-committee on river basin, local organizations, people in the area and stakeholder have an-interest in river basin guidelines to be used as a framework for the plan included in the programs.
•Strategic plan for the management of water resources to meet the needs of the people and the strategies of the province in the river basin of Thailand.
•Proposed master plan for the management of water resources in the future to make a step in a sysmatic system.
•Proposed solutions in the construction measures system and construction measures are not used, based planning framework with 5, 10 and 20 years in the making.
ชื่อโครงการ | Consultancy Services for Integrated Plan of Water Resources Management in Khong River Basin Poject |
สถานที่ | Northeast |
เจ้าของงาน | Department of Water Resources |
ระยะเวลาดำเนินการ | March 2004 – March 2005 |
งบประมาณ |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must