Design Consultancy Services for Passenger Terminal West Expansion Suvarnabhumi Airport Project

Narrative Description

The project is an extension of the West Expansion Suvarnabhumi Airport to increase the capacity to accommodate increased passenger volume at Suvarnabhumi Airport to 60 million people per year

Services Description

The services included the following works:
•Study the potential, needs, facilities, area size and passenger traffic system Cargo load, cargo load, vehicle related to the West Expansion design, Suvarnabhumi Airport Including buildings and other serviced buildings in accordance with the capacity requirement from Airport
•Study and provide recommendation for of security systems according to the passenger terminal model comply with the requirements of the aviation laws of Thailand and International Civil Aviation Organization standard, at least.
•Design for the West Expansion Suvarnabhumi Airport to be able to accommodate at least 15 million international passengers per year
•Design for improve concourses D, G and related areas in order to support international passengers in accordance with the function of West Expansion Suvarnabhumi Airport
•Designing the passenger baggage handling system to be sufficient to support the passenger volume and be able to connect to other buildings efficiently and quickly
•Design and expand the capabilities of public utilities such as Water supply systems, waste water treatment systems garbage collection system, electrical system, communication system, etc. to adequately support the West Expansion Passenger Terminal, Suvarnabhumi Airport to be able to use with maximum efficiency
•Design of the West Expansion Suvarnabhumi Airport consistent with the Suvarnabhumi Airport Development Project (fiscal year 2011- 2017), especially in the extension of the East Passenger Terminal
•Design building lighting systems and building signs which is outstanding and harmonious with the architectural work
•Design Graphic system design of the signage system and systems for disable person

Name of Project Design Consultancy Services for Passenger Terminal West Expansion Suvarnabhumi Airport Project
Location Samut Prakan Province
Client Airports of Thailand Public Company Limited
Duration 24 February 2018 – 30 April 2019
Project Cost