Feasibility Study and Detailed Design of Drainage and Wastewater Treatment System for Welfare Building and Communication Department

Narrative Description

Due to the flooding, wastewater and drainage system problem occur in the premise of the Welfare Building and the Directorate of Joint Communications, Supreme Command Headquarters, the study and detailed design of wastewater and drainage system shall be made.

Services Description

SEATEC and DEC as part of its consulting services rendered following services:
•Contour survey.
•Conceptual Alternative Report.
•Detailed design of collection system and wastewater treatment plant by Activated Sludge Process (Sequencing Batch Reactor : SBR) capacity 500, 400, 200, 100 and 50 cu.m./day, influent BOD 250 mg/l and SS 300 mg/l for the total area of 1,000 rai.
•Specification, tender document and cost estimation preparation.

Name of Project Feasibility Study and Detailed Design of Drainage and Wastewater Treatment System for Welfare Building and Communication Department
Location Bangkok Province
Client Supreme Command Headquaters
Duration September 2001 – March 2002
Project Cost