Environmental Quality Monitoring Work during Construction Peroid of Shoreline Erosion, Prevention Structure Construction Project in the area of Moo 2,3,7 and 8 Tambon Nog Satun, Amphoe Hua Sai, Nakhon Sri Thammarat Province (NRT 1

Narrative Description

Area Moo 2, 3, 7 and 8, Tambon Nasaton Amphoe Hua Sai, NakhonSi
Thammarat Province is an area directly exposed to the winds without any structures preventing winds and waves which is about 7 km in length experiencing severe erosion. It is being specified as the area needing urgently to be tackled by constructing coastal erosion protection structures in the area.

Services Description

Consulting Services in monitoring of environmental quality in construction consists of:
•Check the details of the construction by reviewing work plan and the technical details of the various construction projects components to compare with the details proposed in the report.
•Monitoring the implementation of measures to prevent and reduce environmental impact by monitoring the actual performance of the Contractors compared to the mitigation measures specified in the report.
•Environmental Quality Monitoring and preparation of a report on the implementation of measures to prevent and reduce the impact and the results of monitoring environment including water quality, biological properties of water, air and noise including project public relations.

Name of Project Environmental Quality Monitoring Work during Construction Peroid of Shoreline Erosion, Prevention Structure Construction Project in the area of Moo 2,3,7 and 8 Tambon Nog Satun, Amphoe Hua Sai, Nakhon Sri Thammarat Province (NRT 1
Location Nakhon Si Thammarat Province
Client Port and Marine Corporation (P.A.M) Co. Ltd.
Duration June 2014 – September 2016
Project Cost