It is planning of layout for the main industrial area of 250 m2, study of environmental impact and detailed design of the main road which is an 8-lane concrete road having 200 m ROW (Right of Way) and 19 km long including all utilities and infrastructure and flood protection.
Consultancy Services of Detailed Design and Environmental Impact Study consisting of:
•Master Planning
•Detailed of Main Road
•Conceptual Design of Utilities and Flood Protection
•Environmental Impact Study
Name of Project | Consultancy Services for Detailed Design and Environmental Impact Assessment Study of the Main Roads, Flood Control, Infrastructure & Utilities for the Dawei Industrial Estate in Myanmar. |
Location | Dawei, Republic of he Union of Myanamr |
Client | Italian Thai Development (Public) Co. Ltd. |
Duration | December 2011 – September 2012 |
Project Cost |