Consultancy Services for Environmental Impact Assessment (EIA) Study of Mae Kaem Reservoir Project, Phrae Province

Narrative Description

  Environmental Impact Assessment (EIA) study of Mae Kaem Reservoir (focused on replacement road) to be used for detail design and construction process. The structure of the reservoir consists of catchment area 59.00 km2, length of the river from the upstream to the earth dam 16 km., width of dam 9 m., length of dam 358.563 m. the highest of the dam is 34.2 m., the maximum width of the dam base is 210 m. The amount of soil embankment is about 716,000 m3, having river outlets as water delivery system pass through the existing river to the mine. Reservoir capacity; retention water level is 8,500,000 m3, maximum water level is 9,700,000 m3, benefit area is 7,500 rai.

Services Description

The following tasks were undertaken:

  • Study and review the feasibility report of the project, including water distribution systems to solve the problem and meet the needs of the communities.
  • Study and prepare the Environmental Impact Assessment (EIA) report of the replacement road.
  • Study and prepare the dam break report of Mae Kaem Reservoir.
  • Conduct public participation activities to provide relevant people raise their opinions and comments in the study process.
Name of Project Consultancy Services for Environmental Impact Assessment (EIA) Study of Mae Kaem Reservoir Project, Phrae Province
Location Baan Mae Kaem, Moo 7, Suan Kuean Subdistrict, Muaeng District, Phrae Province
Client Royal Irrigation Department
Duration October 2015 – December 2016
Project Cost