The objective of the project are as follow:
(1)To review the demand to use Kantang Port for container goods.
(2)Engineering study and survey for construct the Kantang Port.
(3)To study and assess the environment impact (EIA) from
the project to compliance with ONEP Guideline.
Environmental Impact Assessment for the construction of the project includes the following:
•Review the demand to use Kantang Port for container goods.
•Engineering Study and Survey
•Environmental Impact Assessment (EIA)
•Public Participation
Name of Project | Environment Impact Assessment Study for Construction of Kantang Port at Trang Province |
Location | Trang Province |
Client | Marine Department |
Duration | October 2009 - September 2010 |
Project Cost |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must