AOT planed to develop the Phuket Airport to increase the capability of the airport for 12.5 million passenger per year in 2018. Composed of ;
1.Airside Group ;
-Construction of Taxiway and Apron
-Construction to expand the aircraft fuel distribution system
2.Terminal Building Group ;
-Construction of International Terminal
-Construction of Car Parking Building
3.Innovate the existing terminal building for domestic terminal Replacement Building Group ;
-Construction of Cargo Building
-Construction of GSE and O&M Building
-Construction of new Fire Station.
4.Utilities Group such as road, airport utilities, airport maintenance office building and Phuket Airport warehouse.
Environmental Impact Assessment for the construction of the project includes the following :
•Study of present Phuket airport activities and the problem from airport operation and method to solve problem.
•Study the existing of environmental resource related to Phuket airport and assess the environmental impact from project development and provided the mitigation measure to decrease the impact and provide the environmental monitoring program for the airport.
•Arrange the Public Hearing activities for the project
Name of Project | Environmental Impact Assessment for Phuket Airport Development Project (Change of Project Detail) |
Location | Phuket Province |
Client | Airports of Thailand Public Company Limited (AOT) |
Duration | February 2009 – June 2009 |
Project Cost |
© 2020 Seatec Group. All Rights Reserved.