Consultancy Services for Environmental Impact Assessment Study for PTT Port and Chemical Tanks Development Project

Narrative Description

   PTT Public Company Limited (Thailand) has assigned PTT Tank Terminal Terminal Co., Ltd. to develop port and liquid products terminal in area of Map Ta Phut Industrial Port Project Phase 1 (extension) at Rayong Province to accommodate growth for the handling of raw materials and chemical products of the petroleum chemical plant in the PTT group with a total area of approximately 57 rai. The wharf structure consist of 20 meters width 200 m long, length of the park can accommodate vessels 320 meters, the maximum size ship 60,000 DWT and deep channel depth of 13.2 m -12.5 m from the CDL. product storage is constructed of 10 product tanks with six kinds of products and transfer by pipe through a closed system.

Services Description

Environmental Impact Assessment for the construction of the project includes the following :
•Study of Project details.
•Survey of Attitude, Public Opinion from the target area which may effect by the project. Prepare Public Participation Project plan.
•Study current Environmental that may effect by the project.
•Analyze and Evaluate Impact Assessment of the project and provide the Mitigation Measuring and Monitoring Program.
•Propose guidelines for Monitoring the impact of the project.
Name of Project Consultancy Services for Environmental Impact Assessment Study for PTT Port and Chemical Tanks Development Project
Location Rayong Province
Client PTT Tank International Co.,Ltd. by PTT Public Co., Ltd.
Duration December 2008 - October 2009
Project Cost