Study and Prepare a Report on Environmental Impact Assessment Study of Suvarnabhumi Airport Expansion Project with Changes in Project Details - Additional

Narrative Description

AOT planed to develop the Suvarnabhumi Airport phase 2 to increase the capability of the airport for 60 million passenger per year, composed of:
1.Construction of new runway (4,000 m length) in the west of the airport with Taxiway and facilities.
2.Concourse Building Group
-Construction the first Concourse Building with the facilities.
-Construction the apron approach to the new concourse building.
-Construction the Tunnel to joint with the existing tunnel.
-Install the Airport Passenger Transport.
3.Terminal Building Group
-Construction for expanded the terminal in the east side of he existing terminal.
-Construction of Airline Office and Car Parking Building Utility Group such as High voltage electrical system, Water Supply, Cooling system, wastewater collection system.

Services Description

The scopes of services are as followings:
•Study of present suvarnabhumi airport activities and the problem from airport operation and method to solve problem.
•Study the existing of environmental resource related to suvarnabhumi airport and assess the environmental impact from project development phase 2 and provided the mitigation measure to decrease the impact and provide the environmental monitoring program for the airport.
•Arrange the Public Hearing activities for the project.

Name of Project Study and Prepare a Report on Environmental Impact Assessment Study of Suvarnabhumi Airport Expansion Project with Changes in Project Details - Additional
Location Samut Prakan Province
Client Airports of Thailand Public Company Limited (AOT)
Duration June 2008 - December 2013
Project Cost