Impact Environment Study for Underwater Pipeline Construction from PTT Jetty to PTTEP Petroleum Supply Base Jetty and Build Up Additional Silo at Jetty Area

Narrative Description

   PTTEP’s Petroleum Supply Base Jetty locates in Ban Huakhao, Singhanakorn district, Songkhla Province. This jetty can contain Ships over 500 ton gross but not more than 2,000 ton gross and already in operation. PTTEP want to install diesel fuel pipe 6 inches from the PTT bridge and pass under the sea to PTTEP’s Petroleum Supply Base Jetty with distance of 105 meter, and increase 24 product and chemical tanks at the back of Jetty. 

Services Description

Environmental Impact Assessment the works as follow :
•Details of the project to conclude the details of construction projects compared to the details of the proposed project on environmental impact study. And offers detailed composition and oil pipeline construction activities. And changes in activity on the Wharf area and related areas. And must conclude monitored environmental quality. And implementing prevention measures and reduces environmental impact. As defined in the environmental impact study.
•Educational resources, environmental conditions further.
-Air Quality and Noise.
-Water quality and ecology of water area construction.
-Oceanography, study, and collected Oceanography data.
-Transportation.
-The aquaculture.
-Economic and social attitudes.
-Evaluation of serious harm.
•Additional an Environmental Impact Assessment.
•The proposed safeguards and reduce the impact. Measures and track information.
Name of Project Impact Environment Study for Underwater Pipeline Construction from PTT Jetty to PTTEP Petroleum Supply Base Jetty and Build Up Additional Silo at Jetty Area
Location Songkhla Province
Client PTTEP International Limited
Duration June 2007 – March 2009
Project Cost