Feasibility Study and Environmental Impact Assesment Study for Road Rehabilitation of Highway 4006, Section Ranong-Lang Suan

Narrative Description

The Department of Highways intends SEATEC to work on 
•Feasibility Study and Environmental Impact Assessment Study for the expansion of highway number 4006 at Ban Racha Kood – Phato District  about 69 km, from 2 lanes to 4 lanes at Ban Racha Kood – Phato District about 26 km. and Phato District – Lang Suan District about 43 km.
•Study for select drift rough way of the project and format suitable for the construction of highways link from Kaper District – Chaiyo District at Ban Na – Ban Khao-Lak about 36 km. 
•Initial Environmental Examination Study (IEE)as the following:
1)Highway expansion project, construction number 4006 at the Ban Racha Kood  - Phato District.
2)Highway expansion project, construction number 4006 at the Phato District – Lang Suan District.
3)Highway construction project linking the Ka-par District to  Chaiya District at Ban Na to Ban Khao Lak.
•Environmental Impact Assessment (EIA) on detailed of the project.
1)Highway expansion project, construction number 4006 at the Ban Racha Kood  - Phato District.
2)Highway construction project linking the Ka-par District to  Chaiya District at Ban Na to Ban Khao Lak  

Services Description

Project Feasibility Study and Environmental Impact Assesment Study the works as follow :
•Review of Existing Studies
•Study and Alternative Forms of Project
•Engineering Study
•Study the Economic and Social
•Study of Traffic and Transport
•Environmental Study
•Study Analysis of the Project

Name of Project Feasibility Study and Environmental Impact Assesment Study for Road Rehabilitation of Highway 4006, Section Ranong-Lang Suan
Location Ranong Province, Chumphon Province, Surat Thani Province
Client Department of Highways
Duration August 2005 – July 2006
Project Cost