Environmental Impact Assessment Study and Detailed Design of Baan Rua Thep Siriporn Terminal Project

Narrative Description

      Objective of the project is construction a new port at Tha Chin River Bank in Samut Sakhorn,  which will be provided for more than 500 tongross ships.  The port's structure was designed at 300 m. of length and 30 m. of width.

Services Description

Environmental Impact Assessment Study the works as follow : 
•Engineering Detailed Design.
•Studying the impacts of the project in term of EIA report.
•Estimated construction cost.
•Tender documentation Preparation.
•Coordination with government agencies for construction permit.

Name of Project Environmental Impact Assessment Study and Detailed Design of Baan Rua Thep Siriporn Terminal Project
Location Samut Sakhon Province
Client Seafood Forum Co., Ltd.
Duration August 2003 - September 2004
Project Cost