The construction of a 50 kilometers long railway track, branching off from the northern line at Bang Krathum station and terminating at Lan Krabu, Kamphengphet province for Thai Shell Exploration and Production Co., Ltd.
Project survey, detailed design and environmental impact assessment study the work as following
•Topographical survey
•Geotechnical survey
•Hydrological survey
•Detailed design of earthwork, drainage, bridges, structures including buildings and associate road works
•Cost estimation
• Land ownership plans/procurement strategy
Name of Project | Servey, Detailed Design and Environmental Impact Assessment Study of Lan Krabu New Rail Track Project |
Location | Kumphaeng Phet, Phitsanulok Provinces |
Client | Halcrow Group (Thailand) Ltd. |
Duration | June 2000 - November 2000 |
Project Cost |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must