There has been annual coastal erosion on the southern highway (No. 408) 10 km. between Hua Sai District and Pak Phanang District of Nakhon Si Thammarat Province. The study of erosion of coastline will be evaluated by comparing the old topographic maps and spot satellite maps. The most serious erosion areas will be identified. The remedial measures, master plan and detailed design of coastal protection are to be made.
Scopes of services are as followings:
•Feasibility Study of:
-Engineering Preliminary Design
-Economics Evaluation (Benefit & Cost Evaluation)
-Environmental Impact Assessment
•GIS Survey and Aerial Photo Preparation
•Detailed Structural Design
•Cost Estimation Preparation
•Bill of Quantities Preparation
•Specification Preparation
•Tender Document Preparation
Name of Project | Feasibility Study and Detailed Design of Shore Protection Works along Pak Phanang - Hua Sai Highways at Baan Nam Sup |
Location | Nakhon Si Thammarat Province |
Client | Harbour Department |
Duration | June 1997 - June 1998 |
Project Cost |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must