This project comprises the construction of Cantilevered Cable-Stray Bridge having main span of 300 meter and side span of 100 meter. Main structures for this bridge is reinforced concrete piers and pre-tensioned steel cables. Part of this project is the construction of approaches connecting the existing roadways to the bridge at both sides of the river.
Scope of work for this project was the design review, design check, recommendation of modification, and professional endorsement of temporary and false works for main bridge and approaches, which included sheet-piling, platforms, piers, docks, bridges, piling, scaffoldings, and temporary offices construction.
Name of Project | Feasibility Study Consultancy Services for Rama 8 Bridge Temporary Work Checking for Main Bridge and Approaches |
Location | Bangkok |
Client | CPB Joint Venture and China State Construction Co., Ltd. |
Duration | June 1999 – June 2001 |
Project Cost |