Review of the Engineering Design and Arrangement of Construction Permit for Map Ta Phut Pier Project

Narrative Description

TOA Corporation has hired the Consultant Company to check the Design for the construction of a (345 x 50) m coal-loading pier that would be able to accommodate the vessel size of 170,000 tons in area of Map Ta Phut Industrial Estate Port. Mitsubishi Heavy Industries. The recipient is Mitsubishi Heavy Industries, which is the main contractor for the construction of 2 x 700 MW coal fired power plant for BLCO Power Limited.  

Services Description

Project review of the engineering design and arrangement of construction permit the works as follow :
The Consultant is responsible for checking the TOA’s pier design, structural calculations and preparation of drawings and documents for construction permits application at Marine Department and Industrial Estate Authority of Thailand (IEAT).

Name of Project Review of the Engineering Design and Arrangement of Construction Permit for Map Ta Phut Pier Project
Location Rayong Province
Client TOA Corporation
Duration September 2003 – May 2004
Project Cost