Mitrphol Sugar Factory at Amphoe Danchang, Supanburi Province has planned to construct the “Conditioning Silo” in order to reduce the humidity of the refined sugar product before packaging. Project consist of Sugar Warehouse-6 size 44.5x90.0 m total floor area 4,005 sqm. with sugar storage capacity of 40,000 ton. Sugar Warehouse-7 size 44.5x168.0 m total floor area 7,474 sqm. with sugar storage capacity of 80,000 ton.
DEC as part of its consulting services rendered following services:
•Design for the foundation work and civil structure which provide strength conform to the factory demands and submit to Mitrphol Group for approval.
•Detail Design for Building work which provide a good architectural aspect and also with a safety in engineering aspect and submit to Mitrphol Group for approval.
•Project Management and Construction Supervision.
Name of Project | Consultancy Services for Detailed Design, Project Management and Construction Supervision of Mitr Phol Conditioning Silo and Sugar Warehouse Project |
Location | Suphan Buri Province |
Client | Mitr Phol Sugar Corp., Ltd. |
Duration | July 2012 - September 2012 (DD) July 2012 - September 2013 (CM) |
Project Cost |