Siam Nippon Industrial Paper Co.,Ltd. Will Construct a MG Paper Machine Plant at 19 Moo 19, SaengXuto Road, ThaPha, Banpong, Ratchaburi. Project consist of Paper Machine building 1,120 sq.m., Warehouse 308 sq.m., Raw Material Warehouse 59 sq.m.
The consulting services rendered following:
Detailed Design
•Site Survey and Site Preparation
•Piling Work
•Building Structure: Paper Machine and Stock Preparation Building, Finished Product Warehouse, Raw Material Warehouse.
•Civil Work (Outside Building): Road & Parking, Drainage System, Domestic Waste Water Treatment, Landscaping
•Mechanical System: Water Supply System, Fire Alarm System, Fire Fighting System, Gardening Water System, Building Sanitary System, Ventilation and Air Conditioning System
•Electrical System: Lighting & Power Plug System, Grounding & Lightning Protection System
•Prepare the bidding process
•Prepare the document for construction permit and signature of the design engineer and architect.
Construction Management and Supervision
•Pre-construction Meeting
•Hand-over the site to contractor for construction
•Coordination channel among the Client, Consultant and Contractor
•Reports & Records: Daily Reports, Climate, Progress, Delay, Equipment, Labor
•Progress Report: Weekly Report, Monthly Report
•Supervised the work according to the contract and instruct the contractor to correct the work
•Routine approval and inspection: Approval for materials, Approval for shop drawings, Inspect the construction safety, Check & Approval the payment request from the contractor, Inspection and testing report
•Advice to the Client for additional work to the contract (Price negotiate, support document)
•Closing the Contract: Certificate of Completion, Punch List, Operation and Maintenance Manual, Deflect Liability Period, Check & Certified Final Payment to the Contractor.
Name of Project | Consultancy Services of Paper Machine for MG Paper PM No.1 (SNP1) Project at Banpong, Ratchaburi Province |
Location | Ratchaburi Province |
Client | Siam Nippon Industrial Paper Co., Ltd. |
Duration | September 2012 – January 2014 |
Project Cost |