Detailed Design and Construction Supervision of New Research and Development Center Building Project

Narrative Description

New Research and Development Center Building consists 
1.Demolition Work for office Mezzanine Floor size 16.50 m x 5.50 m.
2.Liquid Tank Foundation size 15.50 m. x 16.00 m.
3.CIP Tank Foundation size 8.50 m. x 19.00 m.
4.Steel Platform for CIP Tank size 4.00 m. x 22.00 m.
5.4-storey of New Mixing Building size 11.50 m x 36.50 m. 

Services Description

The service for detailed design management and construction supervision consists of:
• Preliminary design
•Detail engineering design for construction ventilation system   sanitary system mechanical works electrical works included   power supply lighting system fire protect  fire fighting system   and all building interior/exterior finishing & interior partition.
 •Cost estimation, tender document and contract preparation.
•Consulting for bidding to select contractor
•Construction supervision
•Project management

Name of Project Detailed Design and Construction Supervision of New Research and Development Center Building Project
Location Ladkrabang Industrial Estate, Bangkok
Client Unilever Thai Holding Ltd.
Duration June 2011 - January 2012
Project Cost