Unilever Thai Holdings Ltd. intends to expand the building area of Packing Hall and New Palletizing Room for Ice Cream Factory for total area of 3,000 square meters at Ladkrabunk Industrial Estate, Bangkok
Project Detailed Design the works as follow :
•Field Survey in area of Packing Hall, New Palletizing, Conditioner Room, New TR Building, Interface Room, Utility Expansion (Refrigeration).
•Design the expansion of Packing Hall and Combitainer Building consist of Pilling Work & Foundation, Structure work, Architectural work, M & E work, Electrical and communication work, Fire alarm & Sprinkler, Utility system, Document preparation (Tender Document, BOQ and Specification) including apply license from the Ministry of Industry.
•Construction Supervision.
Name of Project | Detailed Design and Construction Supervision of Packing Hall Expansion for Ice Cream Plant |
Location | Bangkok |
Client | Unilever Thai Holdings Ltd. |
Duration | June 2010 - June 2011 |
Project Cost |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must