Detailed Design and Construction Supervision of Main Plant and Product Warehouse No.3 Expansion Project

Narrative Description

        The Expansion of Main Plant No.3 approximately area 20,000 sq.m. and Infrastructure works including concrete yard pavement, Road and Drainage System, Waste Water Collection system, storm drainage system , Fence and Gates at Amphur Phayuhakiri,  Nakhonsawan Province.

Services Description

The Consultancy Services are as follows:
Detailed Design Works:
•Main Plant No.3 Expansion Building with area of 20,000 sq.m.
•Improvement of Main Entrance and Access road No.2 including Truck tired cleaning, Truck scale and Security building.
•Structure works for Extension of Evaporator Building.
•The relocation of Water Supply Plant. 
•The Expansion of Covered Roof between Product Warehouse No.2 & No.3 and Covered Roof between Raw Material Warehouse No.1 & No.2 Construction Project.
•The construction of New Canteen & Toilets Building (OB4) 
and Expansion of Office Building (OB3). 
•The Construction of Laboratory Building (OB2)
Construction Management and Supervision Works: 
•The Expansion of Main Plant No.3 Phase 1 (MP3.1) approximately area 5,000 sq.m. construction project. 
•Improvement of Main Entrance No.2 including Truck Tired Cleaning Unit, Truck scale and Security Building. 
•The Relocation of Water Supply Plant. 
•The Expansion of Covered Roof between Product Warehouse No.2 & No.3 and Covered Roof between Raw Material Warehouse No.1 & No.2 Construction Project.
•The Expansion of Main Plant No.3 Phase 2 (MP3.2) approximately area 6,000 m2 construction project.
•The construction of New Canteen & Toilets Building (OB4) 
and Expansion of Office Building (OB3).
Name of Project Detailed Design and Construction Supervision of Main Plant and Product Warehouse No.3 Expansion Project
Location Nakhonsawan Province
Client Dairy Plus Co., Ltd.
Duration September 2010 – June 2013
Project Cost