The detailed design and supervise the construction of concrete foundations for tanks of 800 cubic meters of KK#1 at Khon Kaen Province.
The services included the following works:
•Detailed design
•Cost Estimation
•Tender document preparation
•Construction Supervision
| Name of Project | Structural Detailed Design and Construction Supervision of New Broke Tank at KK#1 |
| Location | Khon Kaen Province |
| Client | Phoenix Pulp & Paper Public Company Limited |
| Duration | July - August 2010 |
| Project Cost |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must