New Dry Store of Ice Cream Factory

Narrative Description

New warehouse dry store of ice cream factory side 35.7 x 183.5 m. included:
1)Packing material for production
2)Raw material for production
3)Chilled store
4)Ultra-clean interface 2
5)Ultra-clean interface 3
6)Ultra-clean workshop
7)Dry waste
8)Renovation area (dry store existing)
9)Substation
10)Tank farm

Services Description

Project detailed design management and construction supervision the works as following:
•Preliminary design
•Detail engineering design for construction ventilation system sanitary system mechanical works electrical works included power supply lighting system fire protect  fire fighting system and all building interior/exterior finishing & interior partition.
•Cost estimation, tender document and contract preparation
•Consulting for bidding to select contractor
•Construction supervision
•Project management

Name of Project New Dry Store of Ice Cream Factory
Location Ladkrabang Industrial Estate, Bangkok
Client Unilever Thai Holding Ltd.
Duration February 2007 - January 2008
Project Cost