Ethanol Plant

Narrative Description

          Ethanol Plant Project cover area about 500 rai or 197.68 acre at Chaibadan District, Lop Buri Province.

Services Description

Project design management and construction supervision the works as follow ;
•Main assignment consisted of Master Plan.
•Detailed Design for 2 ethanol plants, facilities and infrastructure.
•Supervision and management for construction and machine installation including
-Site preparation;
-260,000 cu.m. reservoir;
-Water supply system;
-Raw material (cassava chip) warehouse;
-Milling plant;
-Building for boiler system installation;
-Construction of ethanol plant 1 ;
-Construction of tank farm;
-BIO-Gas & 2nd treatment system;
-Office building, canteen and weighting equipment;
-Electrical system, lighting;
-Road and drainage system;
-Waste water treatment system;
-Staff housing and etc.
•Project management.
•Co-ordinated bidding process.
•Assist in construction permit.

Name of Project Ethanol Plant
Location Lop Buri Province
Client Sap Thip Co., Ltd.
Duration September 2006 - March 2008
Project Cost