Construction Supervision of Siam Clothing Factory at Samut Sakhon Industrial Estate

Narrative Description

         The construction of the Knitting factory on area approximately 3 rai of land at Samutsakorn Industrial Estate which supervision works composed of :
1.Process Area building – approximately floor area of 900 m2.
2.2-storey Office building – approximately floor area of 900 m2.
3.Canteen building – approximately floor area of 450 m2.
4.Road, drainage, electrical and lighting, ventilating and air conditioning system, and dust collection.

Services Description

The scope of services are as followings:
•Supervision of construction of architectural, structural, sewage system, road, drainage, electrical, ventilating and air conditioning system.
•Monitoring of construction schedule.
•Construction Cost / Budget control.
•Materials approval .
•Safety inspection, Review shop drawings, Review as-built drawings and operation manual, Reports preparation.

Name of Project Construction Supervision of Siam Clothing Factory at Samut Sakhon Industrial Estate
Location Samut Sakhon Province
Client Siam Clothing Supplier Co., Ltd
Duration August 2000 – January 2001
Project Cost