Since the EIA of Phuket Airport Development Project had been approved by the OEPP, the mitigation and monitoring measures in the EIA report must be implemented continuously that are:
•to check the mitigation measures; and
•to monitor th coastal erosion, water quality, air quality, noise and vibration, wastwater management, bird and forest ecology.
Project Environmental Quality Monitoring the works as follow :
•Checking the mitigation measures.
•Monitoring the coastal erosion, water quality, air quality, noise and vibration, wastewater management, bird and forest ecology.
•Preparing the report.
Name of Project | Environmental Quality Monitoring of Chiang Rai Airport Year 2002 Location:Chiangrai Province |
Location | Chiangrai Province |
Client | Airports Authority of Thailand |
Duration | October 2001 – August 2002 |
Project Cost |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must