Seacon Development Public Co., Ltd. Intended to construct Vehicle Flyover bridge 1 traffic lane 415 m. for exit from Seacon to Bangkhapi. The construction is reinforced concrete bridge with 4 Boring Piles Ø 1.00 m. 35 m. long, 95 Boring Piles Ø 0.6 m. 35 m. long and 6 Boring Piles Ø 0.6 m. 25 m. long.
Project Management and Construction Supervision the works as follow :
•Construction Supervision for reinforcement concrete bridge with Drainage system, Electrical / Lighting system and Traffic system.
•Assist owner in Construction Detail
•Coordinate concern authority for acquire construction permission.
•Coordinate with contractor and government sector.
Name of Project | Project Management and Construction Supervision of Vehicle Flyover for Seacon Square Shopping and Entertainment Complex |
Location | Bangkok |
Client | Seacon Development Public Co., Ltd. |
Duration | January 2005 – September 2006 |
Project Cost |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must