Detailed Design, Construction Supervision and Environmental Quality Monitoring of PTTEP Jetty

Narrative Description

        The construction of PTT's a jetty and offshore base that will serve as temporary storage depot and loading facility of supply materials for the offshore oil rigs,  located on six rai in Songkhla near the Deep Seaport close to Ban Lei village. The scope of work includes designing and construction supervision of the pier structure dimension of 40 m width x 380 m length that will be able to accommodate the berthing of up to 2,000 gross ton. There are two phases of operation.
Phase 1 :   Consists of the pile driving of 613 spun piles dimension of 60 cm x 45 m length and 139 piles, protection of   the dispersion of sediment, monitoring   of environmental quality.
Phase 2 :   Consists of the construction of berths, dredging work of 180,000 cu.m., general material handling, commissioner building, canteen, infrastructure building, bathroom for truck driver building, bridge pier, water tank 3,000 cu.m., material handing platform 4 unit, installation of electrical systems, plumbing, drainage and flood prevention, environmental protection and other tasks.

Services Description

Project detailed design, construction supervision the works as follow :
•Detailed design and construction supervision of architectural, civil, structural, electrical, mechanical and sanitary engineering systems.
•Environmental impact assessment study.
•Cost estimation of construction.
•Prepare tender documents.
•Cooridiination and constructions.

Name of Project Detailed Design, Construction Supervision and Environmental Quality Monitoring of PTTEP Jetty
Location Songkhla Province
Client PTTEP International Limited
Duration July 2001 – April 2005
Project Cost