Geotechnical Engineering Detailed Design and Construction Supervision of Access Road and Site Preparation for EPEC Combined Cycle Power Plant

Narrative Description

   The Eastern Power and Electrical Co., Ltd. (EPEC) is considering to development a natural gas fired combined cycle generating at Bang Bo in response to EGAT’s request for IPP. The power plant is 350 MW capacities which using natural gas and diesel oil as fuel. The work consists of the construction of temporary bridge and permanent bridge of concrete and steel structure of 8.0 m. wide, 20 m. span, construction of road 10.0 m. width, 0.15 m. thick length of 976.18 m. with crush rock and R.C. bridge with bearing unit of concrete slab on presstressed concrete piles to prevent erosion of bridge approaches.

 

Services Description

Project Engineering Detailed Design and Construction Supervision the works as follow :
•Project Coordination and management.
•Data collection and field surveys of environmental resources and value Assessment of Environmental Impact and proposed mitigation measures and monitoring program.
•Detailed Design and Supervision of Access Road (embankment).
•Design and Supervision ground improvement work of site preparation and Access / Internal Road using geotecxtile-Bamboo Mattress method for site preparation and Vacuum – CMC method for Access / Internal Road.
•Reports preparation.

 

Name of Project Geotechnical Engineering Detailed Design and Construction Supervision of Access Road and Site Preparation for EPEC Combined Cycle Power Plant
Location Samut Prakarn
Client ABB Power General Sdn.Bhd.
Duration June 1998 – September 1999
Project Cost