Consultancy Services for Independent Engineer for Source Improvement Work for Brunei Maura Tutong Water Supply - Ulu Tutong Dam

Narrative Description

Public Works Department, Ministry of Development, Brunei hired 
Sri Kanokporn Construction Ltd.Part as Ulu Tutong Water Storage Dam construction Contractor. In order to get the loan from the Export-Import Bank of Thailand (EXIM) it has hired a consulting firm DEC to conduct a detailed study and evaluation of project construction of building consisting of:
1.Construction and improvement of Dam Access road for a distance of 23 km.
2.Improvement of Water Supply System, installation of water transport pipeline for a length of 270 m, Construction of overflow drainage building and water transport system to power plant, to the plant, Diversion Tunnels, Diversion Canal (Diversion Channel) and  road connecting between building and drainage.
3.Construction of Embankment Dam of 42 m in height, Cofferdam construction, Stilling Basin, and Building protecting soil erosion on slopes.

Services Description

Consultant’s Study Services include:
•Evaluate the work plan of this Partnership Limited can actually work and able to carry out to be completed on schedule or not
•Evaluate if equipment and construction materials and labor on Site appropriate and adequate and predictions in the case of inadequacy.
•Preparation of Monthly Cash Flow up to work completion 
Name of Project Consultancy Services for Independent Engineer for Source Improvement Work for Brunei Maura Tutong Water Supply - Ulu Tutong Dam
Location Brunei
Client Sri Kanokporn Construction Ltd.Part
Duration January 2007– February 2007
Project Cost