Feasibility Study, Survey, and Detailed Design of Training Jetties at Khlong Ja Mook Prong Channel and Coastal Protection Structure at Ban Hua Laem (Lighthouse Side)

Narrative Description

Training Jetties at Khlong Ja Mook Prong Channel
Feasibility Study, Survey and Detailed Design of Training Jetties at Khlong Ja Mook Prong Channel. As a more lasting  measure to facilitate navigation for all fishing boat and other vessels travel ins and outs the channel throughout the year. Via each academic approach to economize and minimize maintenances.
Shore Protection Structure at Ban Hua Laem (Lighthouse side)
Survey and Design for Shore Protection Structure at Ban Hua Laem (Lighthouse side). Along this shoreline is always eroded and flooded by the storm especially in monsoon period which affected more than 100 houses and roads around.

Services Description

The scope of services are as followings:
Training Jetties at Khlong Ja Mook Prong Channel
•Collecting data and related information, revise former study.
•Feasibility study of engineering, economic and environment impact assessments.
•Seminar and public hearing
•Survey and design
Shore Protection Structure at Ban Hua Laem (Lighthouse side)
•Survey and engineering study
•Detail design
•Seminar and public hearing

 

Name of Project Feasibility Study, Survey, and Detailed Design of Training Jetties at Khlong Ja Mook Prong Channel and Coastal Protection Structure at Ban Hua Laem (Lighthouse Side)
Location Chumphon Province
Client Prince of Songkla University / Marine Department (MD)
Duration May 2008 - May 2009
Project Cost