Project Management and Construction Supervision of Tesco Lotus D.C. Phase 5 and Existing Cross Dock Extension at Wangnoi

Narrative Description

Construction management of Design and Build of D.C. (Cross-dock) Phase V. and New Truck Parking Yard and a 1 storey building with mezzanine floor, total floor area of 13,955 m2.
Parking yard to accommodate container of 269 Nos., truck 11 Nos. and Pick-up 122 Nos.
• O.H. Door/Dock Leveler/Plate = 91/66/25 Nos.
• In-bound (Receiving) = 39 Nos.
• Out-bound (Delivery) = 52 Nos.

Services Description

M-TECH accomplished:
• Supervision of all construction works including installation of related service system and architecture, civil, structures, sanitary and plumbing, electrical, mechanical, elevator, and escalator.
• Monitoring of construction schedule.
• Material approval.
• Reviewing and checking the shop drawings submitted by 
the contractor.
• Reviewing and approving the as-built drawing submitted by 
the contractor.
• Report preparation.
• Inspect, record the work done and certify the monthly payment.

 

Name of Project Project Management and Construction Supervision of Tesco Lotus D.C. Phase 5 and Existing Cross Dock Extension at Wangnoi
Location Wangnoi, Ayuthaya Province
Client Ek-Chai Distribution System Co., Ltd.
Duration December 2001 - September 2002
Project Cost