Consultant was assigned by RID to perform the feasibility study and environmental impact assessment of Huai Ban Phum which located in Nam Aune Basin. The objectives of this project are to design a dam capacity of 15 MCM and irrigation system cover an area of 10,000 rai including water balance study of basin area 3,530 km2.
The scope of services are as followings:
• Hydrology and meteorology study.
• Soil and land use study.
• Agricultural and livestock study.
• Socio-economic study.
• Water balance study.
• Project Planning.
• Dam and irrigation system design.
• Cost estimation and construction planning.
• Economic evaluation.
• Organization management study.
• Reservoir operation study.
• Initial Environmental Examination (IEE) Study.
Name of Project | Feasibility Study and Environmental Study of Water Diversion Tunnel from Huai Phai Reservoir to Agriculture Area of Upper Lam Phayang River Basin and of Huai Ban Phum Reservoir |
Location | Sakon Nakhorn and Sri Saket Province |
Client | Royal Irrigation Department |
Duration | June 2001 - December 2002 |
Project Cost |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must