Colgate-Palmolive (Thailand) Ltd. intends to expand Water Treatment Plant, Water storage tanks for fire fighting and expansion of Laboratory Building at Amata Nakorn Industrial Estate Chonburi Province. The project consists of Detailed Design of Waste water treatment Plant with capacity of 1,350 square meter/day Water storage tanks for fire fighting including expansion of Laboratory Building from 2-stories to be 3-stories building.
The services included the following works:
•Prepare for specification and construction drawing with verifier by designer
•Prepare for document to assist in Apply for Construction Permit and Construction Supervision
•Detailed Design for Electrical, Mechanical and Sanitary system
•Construction Supervision
Name of Project | Detailed Design and Construction Supervision for Facilities Expansion Project |
Location | Chon Buri Province |
Client | Colgate-Palmolive (Thailand) Ltd. |
Duration | May 2010 - January 2011 |
Project Cost |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must