The wastewater treatment plant is aerated lagoons process with maximum daily flow rate 9,000 m3/day, influent BOD 200 mg/l as well as chemical wastewater treatment plant 3.00 m3/day by pH adjustment neutralization tank for the existing building as academic building, dormitories, residential buildings and others in the premises of Mahasarakham University.
Construction supervision of the following works:
•Supervision of construction and installation works.
•Commissioning test, prepare manual for operating and maintenance system
•Control the operating system and training
•Prepare As-built draw
| Name of Project | Construction Supervision of Wastewater Treatment System for Mahasarakham University |
| Location | Mahasarakham Province |
| Client | Mahasarakham University |
| Duration | November 2001 – December 2002 |
| Project Cost |
© 2020 Seatec Group. All Rights Reserved.
Designed by A Must