Project management and construction supervision of slope protection and footing to increase the stability of the foundations and the slide protection from surface water and groundwater including renovation of Phramahajadee Santi Keeree.
The supervision of construction consists of the following works:
•Site survey.
•Demolishing of existing footing structure.
•Enforcement of foundation using grouting and curtain grouting, reconstruction and additional foundation construction.
•Floor repairing.
•Additional construction of exterior balcony.
•Renovation of stair entrance and drainage system.
•Architectural work.
Name of Project | Construction Supervision of Slope Protection and Footing at Phramahajadee Santi Keeree Doi Mae Salong |
Location | Chiang Rai Province |
Client | Supreme Command Headquarters |
Duration | September 2001 – November 2002 |
Project Cost |