Scope of work of Ratburi and Samut Songkhram Water Treatment Plant consisting of:
•Lak Muang Water Treatment Plant (Production capacity 500 m3/hr).
-Raw Water system and sludge treatment system
-Clarifeir and spliter box
-Sand filter and collecting
-Clear Well 2,200 m3 capacity
-Production Control building
-Electrical Work : 22kV, 315 KVA
-Operation, control building
-Road, parking, pedestrian and fence
•Pang Puay Water Treatment Plant (Production capacity 1,000 m3/hr).
-Raw Water system and sludge treatment system.
-Clarifier and splitter box.
-Sand filter and collecting.
-Clear Well 2,200 m3 capacity.
-Transmission pump house.
-Production Control building.
-Electrical Work : 22kV, 1,250 KVA.
-Operation, control building.
-Road, parking, pedestrian and fence.
SEATEC as part of its consulting services rendered following services:
•Supervision and management of construction of all works in the project.
•Reviewing and checking the shop drawings prepared by the contractor.
•Reviewing and approving the as-built drawing by the contractor.
•Providing advice related to the construction.
•Report preparation.
•Clear well 4,000 cu.m. capacity at Samut Songkram.
•Distribution pumping station at Dumneonsaduak.
•Distribution line dia 250 mm. length of 10 km. and 600 mm. length of 20 km.
•SCADA controlling system.
Name of Project | Engineering Services for Proposal Evaluation and Construction Management of Ratburi and Samut Songkhram Water Supply Project |
Location | Ratburi and Samut Songkhram Province |
Client | Egcom Tara Co., Ltd. |
Duration | June 1999 - March 2001 |
Project Cost |