Project Management and Construction Supervision of Lotus Distribution Center Wangnoi Phase II (Expansion)

รายละเอียดโครงการ

     Construction Supervision of a 1 storey with Cold Rooms of Lotus Distribution Center, Warehouse Extension II, Wangnoi, Ayutthaya, Province, total floor area of 23,252 m2 including hard and soft landscape. The furnishing and installation of 30 units SM630 Dock-Leveler and 10 units EMM620 Edge Dock-Leveler. The furnishing and installation of 5 units of 1,000 kg pit floor scale weighting and 5 units of 300 kg of movable scale weighting. In - rack sprinkler, new fire pump and piping for existing warehouse.

รายละเอียดการดำเนินงาน

The responsibilities include:
•Supervision of all construction works which include of related service system: architect, civil and structures, sanitary and plumbing, electrical, mechanical and fire protection.
•Monitoring of construction schedule.
•Approval of Material to be used for construction.
•Reviewing and checking of shop drawings submitted by contractor.
•Reviewing and approving of as-built drawings submitted by contractor.

ชื่อโครงการ Project Management and Construction Supervision of Lotus Distribution Center Wangnoi Phase II (Expansion)
สถานที่ Ayutthaya Province
เจ้าของงาน Ek-Chai Distribution System Co., Ltd.
ระยะเวลาดำเนินการ July 1999 - September 2000
งบประมาณ