Detailed Design Consultancy Services for Preparation of Report for Changing Environmental Details for Survey and Improvement Design of Runway Strip, RESA and Taxiways of Phuket Airport Project

Narrative Description

      Study and preparation of Reports for Project Detail Changes and Environmental Impact Assessment Report Phuket International Airport Development Project (for land use changes in the runways) and presented the construction to the Government agency to consider the report on project detail changes in accordance with the law requiring the approval or the approved the guidelines for determine the development of the runway and taxiways to the ICAO safety standards for short-term plans. The work includes the following:
•The construction of RESA at the head of the runway 09 (the west side) by reducing the length of the runway 09 by a distance of 100 m according to the standards of the Department of Civil Aviation and improve Visual Aid (Marking PAPI and Lighting).
•The construction of RESA at the head of runway 27 (Eastside) by removing the (Stop Way) and standing the length of the runway and Displacement Runway by a distance of 100 m at the landing and the end of the runway in existing position.
•The construction of a parallel taxiway to connect with runway 27 and navigation Glide Slope to the north with the improvement of Critical area and Sensitive Area extending the length of the line Taxiway P to connect around the runway 27 and runway extension and improve Visual Aid Approach Light, Marking and Lighting.

Services Description

The services included the following works:
•Study and Review the EIA Report
•Study the Project Details
•Survey and Data Collection for Present Environmental Resources Condition
•Analyze and Assess the Environmental Impact

Name of Project Detailed Design Consultancy Services for Preparation of Report for Changing Environmental Details for Survey and Improvement Design of Runway Strip, RESA and Taxiways of Phuket Airport Project
Location Phuket Province
Client Airports of Thailand Public Co., Ltd.
Duration August 2014 – May 2015
Project Cost