Project Management and Construction Supervision of Tesco - Lotus Super Center Trang

Narrative Description

   Tesco - Lotus Trang located on Trang - Yongstar road and Bangruk - Kuenkun road in an area of 20.9 rai consist of a 1-storey building in mall area, shops, food court of 650 m2 and warehouse, total floor area of 10,450 m2.  Parking area can accommodate of 500 cars and 250 motorcycles.

Services Description

M-TECH accomplished:
• Supervision of all construction works including   installation of related service system and   architecture, civil, structures, sanitary and   plumbing, electrical, mechanical, elevator, and   escalator.
• Monitoring of construction schedule.
• Material approval.
• Reviewing and checking the shop drawings   submitted by the contractor.
• Reviewing and approving the as-built drawing   submitted by the contractor.
• Report preparation.
• Inspect, record the work done and certify the   monthly payment etc.

 

Name of Project Project Management and Construction Supervision of Tesco - Lotus Super Center Trang
Location Trang Province
Client Ek-Chai Distribution System Co., Ltd.
Duration September 2001 - July 2002
Project Cost